Upcoming Events

  • No events.

Event Calendar

February 2009
M T W T F S S
 1
2345678
9101112131415
16171819202122
232425262728 

Archive for February, 2009

Horrific leak in Main Building

*** 2-7-09 LEAK IN MAIN BUILDING ***
Watch the video and then call the Alumni Board and the University Administration and let them know you are paying attention and this is absolutely inexcusable.
http://www.youtube.com/watch?v=SjjUNF7Dx7E

From Peter Townsend, former Environmental Science professor at Antioch College:

Tonight when I visited Main Building I felt large areas on the first floor where the bricks on the outside of the building are saturated with water.  Main Building was built in the 1850’s and the bricks hold the structure up.  On the ground level there are 4 thicknesses of bricks.  For the outside bricks to be slick with water coming from inside the building means all four layers of bricks and all of the mortar in the walls of the saturated areas is filled with water.
When it gets below freezing again, the bricks and mortar in main building will freeze, which will not be good for the building.  Ice damaged bricks in the bottom floor of a building that is supported by its brick exterior, does not bode well for the structural integrity of the building.

Letter of Intent FAQs

Frequently asked questions regarding the Letter of Intent between the Antioch University Board of Trustees and the Board Pro-Tem are available here (via www.antiochians.org):

http://tinyurl.com/b26296

Bad Behavior has blocked 12 access attempts in the last 7 days.